About The Project
The San Jose Mineta International Airport (SJC) Interim Facility Six Gates project consists of a new holdroom that serves five passenger boarding bridges and one ground boarding gate. The new holdroom space includes a grab and go style concession stand, a restaurant and bar area, restrooms and a walkway connection to Terminal B and the arrival baggage carousels.
Built adjacent to our previous SJC Gates 29 & 30 project, the Interim Facility connects to Terminal B which was part of our SJC Terminal Area Improvement Program project. While this is an interim facility, sustainable features were incorporated resulting in a restroom potable water savings of 40% and a 67.25% reduction in lighting power density.